Construction of the closet and wiring which will be run to panel inside.
RASC Hamilton Centre 1979_08
Scanned by Colin Haig 2006-03-23 to 2006-04-03
Scanned with Nikon Coolscan V ED.
These slides had a date on the slide mount, 1979 08, for the Marsh building construction at the Hamilton Centre Observatory.
Not sure when actually taken or when developed.